Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first fix in Ardhiya demands careful planning in confined site space. We run pipes from the main riser to each unit with high efficiency. We test waste and ventilation before plaster and clean pipes from any building debris. Everything must be ready for fixture installation.
Apartments in Ardhiya sit near the industrial zone and are often smaller with fewer storeys. Site space is tight and contractors want phases completed fast. We calculate pipes carefully before cutting and avoid later changes that delay work. Rising water lines run in a shared external wall and waste drops alongside. We flush every pipe with running water before final testing to clear sand and dust from cut channels.
Ardhiya lies in Farwaniya governorate near the industrial zone, a mixed residential district.
We cap every waste branch with a temporary plug after cutting to keep dirt and insects out of pipes.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, pipes must be flushed right after pressure testing before building debris and sand dry inside. Dried buildup causes blockages later when fixtures are installed.
We use the thinnest practical diameter and bend the pipe at a tight angle if needed. We mark every bend on the drawing to help the fixture installer coming later.