Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first-fix in Rehab starts with checking plans and finding load-bearing walls and columns. We run supply lines from the meter and set vertical waste pipes through the structure before concrete pours. We fix water outlets in kitchens and bathrooms and pressure-test every point. On handover the pipework is protected and ready for plaster and finishes.
Most Rehab apartments sit near Rehab Co-op and run four or five storeys with duplexes on top. Families ask for multiple bathrooms and often want extra taps in laundry areas or on balconies. Pipes must take long routes through interior walls and ceiling voids to avoid concrete columns. We test every waste branch by watching slope and flow before final handover.
Rehab sits in Farwaniya governorate, a residential family district where most apartments are rented or owner-occupied.
Pressure-test equipment is used to measure every supply line at 10 bar for thirty minutes before water charging.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We split the pipes on either side of the column through interior walls and ceiling voids. The waste route is drawn to meet the vertical stack at the shortest distance, and supply takes a safe path around the concrete.
After all outlets and pipes are joined and before walls are sealed. We fill the lines with water and measure pressure for a full hour to catch any small leak.