Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Hawalli
Apartment first-fix plumbing in Bayan requires extending water and drain lines from raw structure through pressure-tested and ready-to-plaster work. Bayan's residential area focuses on villas but we handle any plumbing projects with high skill. We ensure every water and drain line is ready for immediate use.
Apartment first-fix plumbing in Bayan requires precise understanding of raw structure requirements and infrastructure. Water lines must extend from main entry point to every planned outlet. Drain lines must flow naturally from every source to the central point. Pressure testing is necessary before work completion.
The area near Bayan Co-op features traditional residential villas and modern designs.
Apartment first-fix in Bayan requires high precision and comprehensive testing before handover.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
First-fix plumbing is the initial phase where all lines are extended in the raw structure. After pressure testing, finishing comes with sanitary fixtures. We complete the entire initial phase.
A medium apartment typically takes one week to ten days based on complexity. We coordinate with the construction team to ensure no delays.
