Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Ahmadi
Apartment first-fix in Dabaiya starts from new concrete frames in a remote southern zone. We route pipes carefully to avoid ground stress and test all joints before walls and ceilings close.
New Dabaiya apartments are remote and sit on uneven ground due to natural slopes. This means horizontal pipes may need more vertical bends than flat urban zones. At each rise or dip we put a small inspection point for later cleaning and air protection in pipes.
Dabaiya is a southern Ahmadi zone where residential building is new and municipal infrastructure reach is limited.
Every waste branch is tested by running a soft ball through it to confirm no blockages or sharp bends stop solid flow.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Smooth 45-degree bends cause no stoppage, but sharp 90-degree angles trap paper and hair. We use long-radius curves or Y-connectors instead of straight elbows.
Three times: hydrostatic pressure test before plaster, smoke test for air in waste before flooring, final operational test by running every tap and toilet together.
