Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Ahmadi
Apartment first-fix in Shuaiba Industrial starts with careful reading of the building plans and pre-marking where kitchens, bathrooms and toilets will sit. We run supply and waste pipes through the concrete frame before walls go up. We pressure-test the entire network before any cladding. Every joint is recorded.
Most residential buildings near the Shuaiba power station are modern structures with deep foundations and thick concrete floors. Main waste stacks run across the first-floor ceiling toward the site's central treatment plant. We calculate the required fall for each waste branch and tie it to the main stack before concrete pours. Supply and waste pipes are clipped with calibrated metal brackets to stop sagging and vibration once pumping starts.
Shuaiba Industrial sits in Ahmadi governorate beside the KIPIC petrochemical complex, an area occupied by project workers and staff housed in residential apartment blocks.
Every supply branch is tested at three bar pressure to confirm tight joints before walls close.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate continuous fall from each unit toward central treatment and support pipes on metal brackets across upper-floor ceilings. Every route is recorded on a commissioning plan.
We usually separate them for ease of maintenance and inspection. Where necessary we stack them vertically or wrap the hot pipe with foam insulation. Every joint stays accessible for future work.
