Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Ahmadi
Pipe-run work in Eqaila starts by extending supply lines from local distribution points through exposed walls before final lining. We select correct pipe diameters for expected pressure and flow, run pressure tests on every isolated circuit, and document each result before closure.
Modern Eqaila units, especially those near Al Kout Mall area, feature separate entry doors and open-plan kitchens into living rooms. This layout means kitchen lines run from back risers to the front facade across longer spans than typical. We route pipes along external walls where they do not cross internal divisions, and use adjustable steel brackets to allow for thermal expansion in hot-water lines. Testing includes visual inspection for leaks at each joint first, then sixty-minute pressure test at thirty bars.
Eqaila lies in Ahmadi governorate near Al Kout Co-op area and features modern apartment towers alongside shopping centres.
We hold pressure-test time at sixty minutes because slow leaks in copper joints only show after pressure stabilizes.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install steel brackets with free gaps every one and a half metres, allowing the pipe to move without straining joints. Copper expands roughly three millimetres per ten metres when heated.
Possible but costly and disruptive. We must expose walls along the original run and insert a new branch fitting. Better to plan all points before the initial pressure test.
