Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Hawalli
Pipe runs laid right before walls close in Jabriya covers running complete supply and waste from the service riser. We install copper supply and classified waste from each unit, then pressure-test with documented results before final construction.
Jabriya flats are usually in modern residential blocks near Kuwait University and hospitals, with supply dropping from rooftop tanks through central service risers. We calculate excess pressure at ground level and fit pressure-reducing valves as needed. Waste descends through isolated pipes within walls and exits the foundation toward the main sewer network with no crossing of supply lines.
Jabriya lies in Hawalli governorate near Mubarak Hospital and American University of Kuwait, a modern residential area with high building standards.
Every waste line is tested by filling with water and holding pressure for thirty minutes, with any leak under one millimetre requiring correction.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We run supply and waste in separate channels, always keeping supply at least thirty centimetres above waste. We verify no crossing or rubbing points where pipes touch.
We issue a variation for the new pipes and valves, test the addition separately, then test the full system again before handover.
