Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Apartment first-fix in Kabd begins by understanding dry desert soil beneath homes and fine dust infiltration. We run pipes with full isolation from dust and seasonal moisture, then pressure-test for extended periods before plaster.
Kabd buildings scatter across farmland and desert, each flat relatively isolated. Sandy and clay soil shrinks and expands with seasonal moisture changes, causing tiny cracks in foundations and slabs. We run pipe with slightly extra length and leave it free from rigid concrete attachment, instead using flexible clips that allow small movement. Subfloor waste is installed with slightly steeper falls because sand may rise or drop a few millimetres.
Kabd lies in Jahra governorate as a desert zone with camel racing and farmland where foundations are unstable.
We test lines through three pressure cycles up and down over one hour because soil movement may gradually weaken joints.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We cover every inlet and outlet with fine mesh during construction and check filters after completion. Fine dust may clog cold lines if it enters through initial vents.
We leave pipes with spare length and flexible fixing instead of rigid concrete attachment. Every joint is pressure-tested a week after installation because initial movement happens quickly.
