Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Apartment pipework in South Jahra covers residential units in varied towers at distance from the central pump station. We lay pipes carefully to ensure steady slopes and true horizontals before testing and closure.
South Jahra apartments are usually in towers of varied sizes and designs from different development schemes. Distance from the main pump station means waste lines need high precision in slope and depth under the slab. We work with local water and sewer subdivision plans and coordinate with zone valves to ensure proper pressure in each unit. Pressure testing is crucial because long runs reveal weak joints.
South Jahra lies in Jahra governorate, a growing residential suburb with modern housing projects and expanding tower blocks.
We test waste lines by running water at the actual minimum pressure of the pump station because testing at high pressure may miss weakness that shows up in daily use.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Long distances reduce natural pressure and can cause weak flow on upper floors. We calculate pressure drop along the run and choose larger-diameter pipe if needed. Pressure testing confirms every unit gets adequate flow.
Heat accelerates plastic expansion and can cause sagging or kinking in poorly supported pipes. We use metal brackets every metre and leave small thermal expansion gaps. Pipes buried under the slab are more protected than those exposed to air.
