Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Pipe runs for first-fix apartments in Qaisariya require careful coordination with deep foundations and local drainage channels. We route pipes around structural elements, connect waste lines to existing channels and pressure test before wall closure.
Old and new houses mix in Qaisariya, and traditional drainage channels cut across the entire area. When first-fixing new apartments we survey these channel routes and connect waste pipes to them rather than build independent drainage. Foundations run deep because the water table is high, so pipes pass carefully around piles and deep bases. We measure the actual gradient of existing channels before designing our pipe fall.
Qaisariya lies in Jahra governorate and is marked by traditional drainage channels linking residential and farming zones.
Before connecting to an existing channel we inspect the junction point for accumulated blockages and debris from years of use.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a laser level to measure height at two points along the channel, then calculate its actual gradient. This determines the fall our new pipes must achieve to connect cleanly.
We do not connect new waste to a blocked channel. We ask the site owner to clean it first or we drain to an open channel nearby instead.
