Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Jahra
Pipe runs for first-fix apartments in Abdali start from the central supply riser at the eastern site boundary. We route pipes over long distances across the base slab while maintaining correct falls and test each section separately.
Abdali residential clusters sit far from main feed stations, so pipes run long distances from the central riser to distant wings. We calculate pressure loss over the long run and use larger copper pipes to ensure adequate pressure in far apartments. Waste lines also need larger bore for the long fall, and we inspect every joint to confirm no leaks under heavy loads.
Abdali sits in Jahra governorate near the Iraqi border, a farming area now hosting modern residential clusters.
At the end of every long supply line we measure pressure and flow to ensure it does not fall below two bar at the furthest outlet.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate expected loss before laying and choose larger pipe bore than standard. We start with higher pressure at the main riser so distant apartments receive adequate pressure for normal use.
Yes, we use larger bore waste pipes so drain water reaches the main stack with sufficient fall. At every fifteen metres we place a cleaning eye to allow blockage removal.
