Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Apartment pipe runs in Qortuba mean routing hot and cold supply from the building's main riser to each unit before walls close. We lay copper tubing with proper falls for drainage and pressure-test every line before it gets plastered over.
Qortuba villas typically have a master bathroom, guest bathroom and separate kitchen panelling, each needing its own water inlet and waste line. We start from the central stairwell where the main supply riser passes and measure distances across the floors, then run copper pipe through partition walls before they are poured. Drainage runs parallel to the supply down to the ground floor level where it connects to the building's main sewerage stack.
Qortuba is an upscale residential area in Kuwait governorate, where large family villas share a unified sewerage system and central water riser.
After laying all pipe, we fill each line and wait one hour to spot leaks before walls are closed.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a laser level to measure the gradient at every open point, with correct fall being 1 cm per metre of pipe. We record the readings and run water at speed to watch it drain smoothly without pooling.
No, supply lines must stay at least 30 cm away from waste to avoid heat transfer and odour. Supply runs in insulated copper pipes and drainage in separate PVC, each easy to inspect.
