Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Apartment first-fix in Qairawaan installs hot, cold and waste copper tube in each unit according to drawings before walls close. We connect every line to the main riser, pressure-test at 15 bar then run water for one hour to confirm soundness.
Qairawaan's traditional residential blocks hold small to medium units with one bathroom and open kitchen area, which simplifies the pipe routing. We start from the lower floor where main water enters and run tubes through wall cavities with consistent right angles. Drainage drops straight to the central pit beneath the building, and before handover we fill both kitchen sink and bath together to watch water drain evenly without backflow.
Qairawaan is a residential urban area on the Seventh Ring Road in Kuwait governorate, where mid-rise apartment buildings are clustered.
We cap every water line with a pressure seal after testing to keep dust out before fixtures arrive.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We inspect every joint and every drain stack with full water flow from multiple directions. We record any seepage or sluggish drainage and repair it before final wall closure.
No, all pipes must be laid and tested first. The heater is fitted after testing and sign-off; early installation risks damage from construction water and dust.
