Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Capital
Pipe runs in Shamiya start with checking drawings and locating the main and branch stacks in the raw structure. We lay cold, hot and waste lines through floors and walls before final concrete pours. Every line is pressure-tested at constant pressure for two hours to confirm no leaks. Handover is a apartment ready for finishes.
Shamiya apartments are usually in modern tower blocks near the Fifth Ring junction, buildings with central waste stacks and tight cavities in load-bearing walls. We coordinate with the main contractor on stack position before foundation pours, and run kitchen and bathroom waste at a steady fall of one centimetre per metre toward the stack. Horizontal runs under floors pass through holes drilled in precast concrete beams.
Shamiya sits in Kuwait governorate and is known for dense apartment towers on the ring road, where most foundation work runs to a tight schedule.
We test connections with air pressure rather than water on upper floors because standing water corrodes the internal coating of pipes.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Changing routes after pouring means drilling concrete and rerouting, which delays the schedule. We require drawings locked and approval before any excavation or pour begins.
We drill beams before installation at five millimetres larger than pipe diameter and smooth the edges. The pipe passes through and we fill the gap with flexible waterproof sealant instead of dry mortar.