Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first fix in Shamiya demands precision in modern multi-storey houses where the prep area may sit far from the main vertical stack. We lay supply, waste and vent lines and secure them to the lower concrete soffit before the topping pour. Every joint is tested under full pressure before any closure.
Houses in Shamiya near Fifth Ring Road junction often sit on narrow plots stacked across several storeys with low ceilings. The kitchen may occupy a remote corner far from vertical stacks, forcing us to run long horizontal lines under the slab or above the soffit. We check the fall on every horizontal arm and route pipes so they do not steal headroom on the floor below.
Shamiya sits in Kuwait governorate near Fifth Ring Road junction, a dense residential zone where houses are built with relatively low ceilings.
In most multi-storey Shamiya homes we run vertical pipes inside existing walls rather than drilling through concrete, because the frame is solid.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We run a horizontal waste line under the slab or above the soffit toward the wall where the stack stands, maintaining a steady 1:40 fall. Pipes are routed at exact depths to avoid sharp bends.
We route pipes inside existing walls, or use slim-line pipes or run horizontally under the slab instead of dropping from above. We choose the path that preserves headroom and maintains proper fall.
