Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Abbasiya requires running supply and waste pipes before suspended ceilings and walls close. We choose pipe routes to avoid structural columns and test pressure and drainage under real-world conditions. Waste is arranged with a steady fall and clears every obstacle in the wall path.
Abbasiya houses are medium-sized with multiple bathrooms, each needing separate hot and cold feeds and its own waste line. We run supply lines under slabs or within reinforced concrete walls, leaving adequate gaps between pipes for maintenance access. Waste from each bathroom slopes under the floor at a regular gradient toward the main trap or soil stack.
Abbasiya is a residential neighbourhood in Farwaniya with moderate building density and robust concrete construction.
Before completion, every outlet is opened and water is run for one minute to flush debris from the pipes.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We draw a detailed plan before pouring that shows every pipe run, column, and beam. We brief the concrete team on all routes and coordinate directly before pouring so they leave dedicated chase ways for each line.
Under-floor is cheaper and cleaner to look at but requires constant slope and maintenance access. Above-slab suits later additions but needs strong supports and acoustic wrapping to control noise.
