Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Farwaniya
First-fix plumbing and electrics in Abbasiya starts with reading the engineering drawings and assessing the electrical load needed. We distribute pipes from the meter cabinet out to each flat. Every route is protected with temporary ducts and covers. It ends with full pressure and insulation testing.
Abbasiya is a dense residential district of multi-unit apartment blocks near Abbasiya public garden. Each building needs supply distribution points on the roof or basement. We run vertical risers in hidden chases and set horizontal branch points on each floor. Plastic waste pipes are fixed with metal brackets every metre minimum.
Abbasiya is in Farwaniya governorate, an area marked by older and newer apartment blocks that need updated infrastructure runs.
We test every electrical chase at 500V insulation because moisture in residential zones causes early ground leakage.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We place them in a central chase near the main stair to minimize branch length on each floor. The chase is protected by a concrete block wall so it won't be damaged during construction.
We pressure-test every pipe at 6 bar immediately before pouring and hold pressure during the pour. Any leak is found and fixed right away before render starts.
