العربية Call now
Bathroom first-fix

First-fix plumbing for new houses

Bathroom rough-in done right before walls close

PPR supply lines and uPVC waste runs set to correct falls, pressure tested on record before screed, so no tile-breaking later

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What the rough-in covers

Running hot and cold supply and waste lines to every bathroom point before finishing

Hot and cold supply points

PPR lines routed precisely to basin, shower and toilet positions

Bathroom waste lines

uPVC drain runs laid at correct fall to prevent standing water

Floor trap installation

Floor trap levels set before screed to align flush with final tiling

Vent connection

Connecting the waste run to the vent stack prevents trap siphoning and odour

Pressure test

Documented pressure test on supply lines before walls are permanently closed

Point positions record

All supply and waste point locations recorded for finishing and future maintenance

How the job runs

01

First contact

Call or WhatsApp us with bathroom count and current build stage

02

Site visit

We visit to confirm pipe routes and mark every supply and waste point

03

Pipe installation

Supply and waste pipes installed, drain falls checked before screed pour

04

Pressure test

Documented pressure test on supply lines to confirm every joint is sound

05

Handover

Test record and point positions handed over before walls are closed

Materials and methods used

PPR pressure pipe

Handles high temperatures and hard mineral water without corroding internally like old galvanised iron

uPVC waste pipe

Smooth bore resists scale build-up and holds correct fall over the long term

Heat-fusion jointing

Fused joints in PPR pipe eliminate adhesive-dependent fittings that can fail over time

Hydraulic pressure testing

Pumping a set pressure into the line and monitoring the gauge reveals any weak joint before screed is poured

Before you call us

01

Fixture decisions

Confirm toilet, basin and shower types before rough-in as their dimensions fix point positions

02

Bathroom layout drawing

Any sketch showing bathroom dimensions and fixture positions speeds the site visit and reduces changes

03

Current build stage

Clarify whether the slab is poured and whether floor tile thickness has been decided yet

04

Water heater type

Knowing whether a central or individual heater is planned affects the hot supply routing from the start

More in first-fix plumbing for new houses

Part of First-fix plumbing for new houses · All services · Back to the home page

What decides the price

No fixed price list applies; these factors shape the quote for each bathroom rough-in

Number of bathroom points

Each extra supply or waste point adds pipe length and labour hours

Pipe routing distance

Bathrooms far from the main stack need longer runs and more fittings

Specified pipe grade

Pipe diameter and pressure rating requirements affect material cost directly

Drain line complexity

Multiple levels or tight routing directions increase the fitting count and time

Total bathrooms in project

Roughing in multiple bathrooms on one project is priced differently from a single bathroom

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Sanitary fixture installation
  • Cistern and mixer repair
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Water pipe leak repair
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Restaurant gas lines
  • Gas leak detection
  • Kitchen plumbing runs
  • Water pump install and service
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Building and complex maintenance
  • Roof tank and basement pumps
  • Water tank installation
  • Operation and maintenance contracts

Why us

Why Al Amana for bathroom first-fix

Amana means trust. Someone else’s home is not ours to be careless in.

  • Photographed before and after

    Do not take our word for it. Look at the work yourself.

  • We find it before we break it

    The leak is marked before a single tile comes up.

  • 24-hour emergency

    A leak does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

We cover all of Kuwait

Six governorates, 139 areas.

CapitalHawalliFarwaniyaAhmadiMubarak Al-KabeerJahra

Common questions

Questions about bathroom first-fix

Need someone now? The emergency line is open any hour.
+965 9668 4964

Can a waste point position be moved after it is set during rough-in?

If the screed has not been poured yet, adjustment is straightforward. After pouring, moving a point requires breaking the floor, which is why we confirm all positions with the owner precisely before work starts.

Why does a bathroom with a built-in shower niche differ from a standard bathroom rough-in?

A built-in shower niche needs a drain point at the centre of the shower base with a fall from all sides, plus separate hot and cold supply points. A level error here shows up later as standing water that will not drain.

How does Kuwait's hard water affect bathroom rough-in before finishing?

Hard mineral water deposits scale inside supply fittings over time. This is why we use PPR pipe with heat-fused joints rather than threaded connections that can trap deposits or loosen under the thermal expansion common in Kuwait's climate.

Does bathroom rough-in include fitting the sanitary fixtures themselves?

Rough-in covers pipes and stub-outs only, because fixtures are installed after tiling is complete. Toilet, basin and mixer fitting happens at the finishing stage, which our team can carry out as a separate visit.

What is the difference between roughing in a bathroom in a new villa and replumbing an existing one?

In new construction, pipes run through open voids before screed, which is faster and more precise. In a renovation, walls and floors are already closed, so existing lines must be inspected with a camera before any breaking is considered.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp