Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Hawalli
Bathroom rough-in in Anjafa requires careful assessment of tank capacity and load distribution across the internal pipe network. We run hot and cold supply and waste with calculated fall angles. We test every joint and inspect exposed pipes for integrity before sealing.
Houses and buildings in Anjafa are a mix of old and new, some still using ground-level tanks alongside roof tanks which complicates pressure calculations. We measure the vertical distance between the upper tank and the farthest outlet to determine available natural pressure accurately. If the distance is insufficient we install a thermostatic booster pump that activates when pressure drops below a set threshold.
Anjafa is situated in Hawalli governorate, a mixed residential zone blending older houses with modern apartment blocks.
We inspect both ground and roof tanks before starting because having both tanks changes fall and pressure calculations entirely.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, a ground tank usually comes after the main pressure unit and does not deliver enough pressure to upper floors. We use the roof tank or install a booster pump on the cold line from the ground tank to ensure water reaches with steady pressure.
Yes, we test the waste line under low pressure first to avoid shifting older soil under the slab. Then we test it at full flow to confirm the pipe fall is adequate to carry normal bathroom drainage without blockage.