Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in in Dhaher requires careful planning for water supply and drainage in a desert setting. We run supply lines from the roof tank or pump station with precision, and connect waste to a safe point away from groundwater. Every joint is tested under pressure before finishes start. We assess soil quality and drainage to choose the safest waste outlet.
Isolated buildings in Dhaher rely on roof tanks or private wells, so we ensure supply lines are protected from pressure swings. We fit pressure regulators if flow is uneven, and prevent sudden pressure drop when multiple outlets open together. Waste must fall steadily toward a pit or soakaway, and the sandy soil in Dhaher allows quick drainage but we observe safe distance from any water source.
Dhaher in Ahmadi governorate is a remote desert zone where buildings are scattered and infrastructure is sparse.
Before handover all waste outlets are run together to verify the fall meets 2cm per metre with no pooling at any point.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Tank height determines natural pressure, but long horizontal runs or distant bathrooms may reduce it. We calculate height and distance first, and recommend a small pump if needed.
We bury the pit at safe depth far from any known drinking well or water source, typically 30 metres or more away. We test soil quality to ensure fast absorption and safe dispersal of outflow.
