Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in at Ahmadi Stables starts by understanding the spread-out buildings and long distances between them. We run hot and cold supply from the central tank through buried pipes to every fixture point. Waste drains downslope toward distributed floor traps across the site. We test pressure and flow before walls close.
Equestrian facilities at Ahmadi Stables are spread across long distances with sandy ground and wide surface drainage patterns. Bathroom rough-in here requires careful fall calculation over the long run to keep water moving without pooling. We use larger-diameter pipes for distance and position every trap at a low point. Floor traps must sit away from feed storage and grain areas. Leaks from hot and cold supply in sandy soil show up fast, so we pressure-test hard before burial.
Ahmadi Stables sits in Ahmadi governorate, a dedicated equestrian and racing zone that demands reliable rough-in built to handle heavy use.
Because buildings are spread far apart, we pressure-test each section of the rough-in separately before connecting them together.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate total fall from the fixture to the floor trap and switch to larger pipe where gradient reduces. We raise pipe supports at intervals to maintain steady descent throughout.
Yes, we use higher test pressure because sandy ground does not stop water seepage quickly. Any small leak will show on the surface very fast.
