Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Jleeb Al-Shuyoukh starts by creating supply and waste networks in high density and tight urban space. We run pipes quickly through narrow gaps between walls and test every joint before walls close. Waste descends steadily to the main stack with no lag or pooling.
Jleeb Al-Shuyoukh houses are built at very high density, with many bathrooms in tight space requiring complex parallel pipe runs. We use PVC pipes in different sizes and stack them vertically in walls to save horizontal space. Where two lines cross, we reroute the less-used one around the other with a gentle curve instead of a sharp bend that slows water.
Jleeb Al-Shuyoukh is a dense market neighbourhood in Farwaniya adjoining old Kuwait City, where buildings stand shoulder to shoulder and gaps are tight.
We test waste by filling a full tub in each bathroom and draining it once to confirm actual discharge rate.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We choose different pipe diameters, some 15 mm and others 20 mm to match expected flow, and stack them vertically rather than horizontally. We leave tiny gaps between pipes for easy fitting and thermal expansion.
Yes, but we wrap the hot water line in thick foam insulation to prevent heat loss to the adjacent cold line. We maintain at least 50 mm spacing between them.