Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Mubarak Al-Kabeer
Bathroom rough-in at Mesila runs hot and cold supply from the tank room to every bathroom and toilet point. Waste drains from each point toward the main sewage network or local floor traps. We test every pipe and joint before finishing.
Mesila is near a beach hotel and green island, with multi-storey residential buildings housing multiple bathrooms and heavy drainage loads. Rough-in needs large-diameter pipes that handle flow from several bathrooms simultaneously at peak times. We run waste lines at steady fall from the top storey to a basement collection line. Hot water pipes must be accessible in upper floors and near inevitable break points. We test pressure at each riser and push water fast through long runs to reduce cold water waste.
Mesila lies in Mubarak Al-Kabeer governorate near Mesila Beach Hotel, where tall buildings demand robust rough-in to endure heavy continuous loads.
Because multiple bathrooms use hot water together, we test the hot line under higher pressure and continuous flow for a full hour.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We insulate hot pipes with thick foam and route them as directly as possible. We install a thermostatic return valve at the tank to recirculate warm water when use is not continuous.
We install a pressure pump to lift water above the roof tank. We test the pump and pipes together under high pressure and fit a relief valve at the highest point.