Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Mubarak Al-Kabeer
Bathroom rough-in in Qurain starts with careful planning of hot supply, cold supply and waste routes before walls close. We run copper and plastic pipes from the main meter, test every drain point and check for leaks before final construction.
Qurain family homes are often multi-storey with bathrooms on ground and upper floors, meaning water lines must run through foundations and inner walls before closing. We position pipes carefully so they stay accessible later if repairs are needed. Drainage fall from upper bathrooms down to the stack requires careful calculation to stop water pooling in the pipework.
Qurain lies in Mubarak Al-Kabeer governorate, a residential district where closely built houses make pipe planning a critical part of construction.
Before wall closure, every line is filled with water and monitored for a full hour to check for leaks at every joint and fitting.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We select pipes based on expected temperatures and wrap cold lines with low-density foam insulation. Copper pipes for hot water are fixed with metal brackets that allow for thermal expansion.
This is very rare because we pressure-test every line before final construction. If a leak does occur, we pinpoint it exactly with detection equipment before opening the wall in the smallest area possible.