Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in in Ruqqa starts with a full site survey before construction to locate waste outlets and water sources. We extend pipes from the main water supply to each bathroom and connect waste with steady fall toward sewerage or the tank. We test pressure, fall and leaks before walls are closed with concrete and brick.
Ruqqa houses are mostly modern construction on slightly elevated ground, which eases drainage toward central collection tanks or neighbourhood sewerage. We work from the plant room and extend pipes through suspended ceilings or within concrete walls pre-built for them, coordinating with the structural team to avoid pipe-to-rebar clashes. At each bathroom we connect waste points with sloped angles that prevent pooling and stagnation, and test each outlet under steady flow before handover.
Ruqqa is a residential area in Ahmadi governorate characterised by clusters of modern construction with developed infrastructure.
We coordinate pressure testing with the construction team right after concrete pour to catch any damage from pouring and stripping.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We coordinate with the structural engineer before steel fixing to mark pipe routes precisely on plans. If an emergency clash occurs, we adjust the route slightly or raise the point by cutting extra chase space under his supervision.
We use a laser level to check fall every three metres of pipe and record readings in the file. A slope of 1 to 2 cm per metre ensures water flows freely without air locks or sediment buildup.