Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in in Maqwa starts with careful planning of supply and waste before walls close. We run pipes from the central water tank and secure them with full pressure testing. Steady drain slope and tight joints stop future leaks and blockages. Good rough-in allows easy maintenance later.
Maqwa is a simple industrial zone near oil fields with uniform worker housing and small identical bathrooms. Rough-in here is straightforward: one hot line and one cold from the tank and a single waste to the shared floor trap. The ground is sandy, so we need careful digging to avoid trench wall collapse. We use standard uniform-diameter pipes and place stopcocks at easy-reach points.
Maqwa sits in Ahmadi governorate near national oil company fields and is a confined industrial residential zone.
Each bathroom is tested at steady pressure for twenty minutes before moving to the next unit.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, uniform housing layout means the same diameter and length for every bathroom. We use identical pipes and fittings in each unit quickly and accurately.
We dig carefully and bed pipes on compacted fine sand and bury them with extra protection. Waste runs under soil at depth to stay safe from future digging.
