Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom rough-in in Saad Al-Abdullah City starts before tiles and walls are set by measuring from the main riser. We run hot and cold supply lines and waste to every fixture point and test pressure and flow before walls close.
Most flats in Saad Al-Abdullah City have a shower head, sink and toilet in one bathroom, which means waste lines must meet at one point before dropping down the stack. We plot every fixture on the plan before walls open and check that each waste branch has a fall of at least one centimetre per metre. If the bathroom is tight, some pipes may hang on inner walls instead of being buried.
Saad Al-Abdullah City is in Jahra governorate, a planned residential city with similar multi-storey residential towers throughout.
Before flat handover, each supply line is filled with water and capped to check for no leaks under floors or behind walls.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It is possible but costs more because new pipes will show on the wall or under new tiles. Best practice is to run spare branches in the rough-in before walls close.
Visual inspection finds only obvious leaks and loose joints. Pressure testing fills the line with water and holds it for hours to find internal leaks that show up later in use.
