Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Jahra
Pipe and wire routes in Saad Al-Abdullah City follow a standardised master plan used across all villas and residential blocks. We run parallel pipe and cable routes from a central junction point to each unit with minimal deviations. Every run is tested immediately after installation before wall closure and concrete pour. Coordination between mechanical and electrical crews prevents crossing and delays.
Saad Al-Abdullah City is a newly planned city with regular streets, uniform plot sizes and a central collective sewer network. Buildings are uniform in design with horizontal pipe distribution in dropped ceilings and vertical runs in walls. We run pipes and cables together from a basement distribution floor to bathrooms and kitchens on each level. Every unit gets a single branch line from the main network for easy independent testing.
Saad Al-Abdullah City sits in Jahra governorate as a newly planned residential city with regular geometric layout throughout.
Each individual supply and waste branch in the city is tested under full pressure before connection to the main network grid.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Minor changes are possible but need municipal approval because the main grid is standardised. We redesign the individual branch line to the same fall and pressure standards before installation.
We isolate the individual branch supply and waste with a temporary stop valve from the main network. We fill the pipes and test under full pressure, then reconnect to the main grid once approved.
