Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Hawalli
Bathroom rough-in in Salwa starts with running hot and cold supply and waste lines before walls and tiles go up. We plan the locations of toilet, shower and basin and run pipes with proper falls from the roof tank. We test pressure and leaks and leave all pipes exposed for final inspection before sealing.
Most residential apartments in Salwa are modern construction with standardized bathroom sizes and uniform ceiling heights, which makes pre-planning supply lines straightforward. We calculate falls from the roof tank through pipes hidden in party walls between adjacent units. Where a bathroom sits on an upper floor and the roof tank is far away, we install a booster pump on the cold line to maintain pressure at every outlet.
Salwa lies in Hawalli governorate near Salwa Co-op, a dense residential zone dominated by modern residential buildings.
Every supply line is pressure-tested at 6 bar for half an hour before walls close because any leak will be hidden once finished.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We size the distribution pipes by the number of hot-water outlets and choose an insulated tank large enough for the bathroom. If the tank sits far from outlets we insulate the pipes to reduce heat loss in transit.
If we plan the rough-in with spare capacity we leave unused pipes inside walls or under the slab connected to the main lines. This allows a new bathroom to be connected quickly without breaking open entire walls.
