Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Hawalli
First-fix coordination in Salwa begins with blueprint review and plumbing-electrical team sync before concrete is poured. We run water, waste and gas pipes in separate runs and cut channels for power cables at consistent depth. Each line is pressure-tested and insulation-checked before walls and ceilings close. The work demands precise alignment so routes never cross.
Salwa houses are typically three or four-storey villas with reinforced concrete frames, meaning pipe routes must follow existing shutter lines. Near Salwa Co-op we find attached residential units sharing party walls, so horizontal runs demand precision to prevent clashes. We lay hot-water pipes at set gradient and waste at steady fall within frame voids before upper-floor slabs are poured.
Salwa lies in Hawalli governorate, a settled residential zone close to Mishref Park where most buildings are in final construction phases or near completion.
Every water line is pressure-tested at 10 bar for ten minutes because minor leaks may only show after walls are closed.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We plot both runs on shared installation drawings before work starts and maintain 10 cm clearance between water pipes and cables. Visual checks and measurement during fixing ensure no clashes occur.
Post-handover repair means cutting into walls and rebuilding, so pre-closure testing is mandatory not optional. We document each test with pressure readings and duration to prove integrity before closure.
