Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Sulaibikhat starts from the roof tank or main meter on the Fourth Ring Road waterfront. We lay cold and hot supply and waste under tiles before walls rise, testing pressure and flow at every point.
New Sulaibikhat waterfront villas need robust hot water pipes because flats are tall and distance from heater is long. We install copper pipes insulated from roof to every bathroom and pressure-test at ground, first and second floors. Waste lines need steady fall from each bathroom toward vertical stacks in an outer wall, and we guard against odours from sea winds carrying salt.
Sulaibikhat sits on the Gulf waterfront in Kuwait governorate, a seafacing zone of newly-built residential villas.
Waste pipes need enough flow to self-clean, and where flow is low we install water hammer arrestors to pulse the flow.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use copper pipes lagged with 25 mm foam which cuts heat loss significantly. We test reach time and if hot water is slow we install a small recirculation pump to keep the pipe warm.
We choose copper or galvanized metal pipes, not plain steel. We coat metal joints with protective layers and ensure good ventilation around exposed pipes to prevent moisture pooling.
