Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Rawda takes advantage of modern construction and spacious corridors. We run pipes in clear paths from the roof tank to every tap, shower and basin. We connect waste on a uniform fall toward the main stacks. Thorough testing before building closes ensures no later faults.
Homes in Rawda near Rawda Co-op and Rawda Park are designed in a modern layout that allows multiple bathrooms side by side. Pipes can run together in prepared ducts instead of scattering through walls. Waste from each bathroom flows in its own stack to the main column without mixing with others. This order makes later maintenance simple: if one bathroom has a problem its line can be isolated and cleaned without disturbing the rest.
Rawda sits in Kuwait governorate, a spacious residential district rich in green space and public parks.
After all pipes are installed each waste line is filled with water and watched for five minutes to check flow with no air pockets or leaks.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, one tank on the roof is sufficient if it is properly sized and supply pipes have adequate diameter. We calculate tank volume based on fixture count, and raise pipes thick enough to maintain equal pressure at all points.
Yes, but the shared pipe must be larger than either single line. At the junction we connect at 45 degrees to prevent blockage when water flows from both at once.
