Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Farwaniya
Drain lines laid right in Abraq Khitan handle modern family villas, deep foundations and raised ground levels. Advanced design here means long waste runs under the slab with a vent stack and multiple cleanout boxes. We test pressure and slope before pouring and record every measurement in the report.
Abraq Khitan in Farwaniya holds modern family villas with varied architectural designs, large gardens and deep foundations. Waste lines start from foundation depth and run horizontally to the collection pit with a steady fall of at least 1 cm per 50 metres. We fit floor traps under the kitchen, main bathroom and any additional bathrooms. The vent stack rises outside the house and exits the rear wall or roof above any window. Cleanout boxes are placed at every change of direction and gradient so maintenance can reach any blockage easily.
Abraq Khitan in Farwaniya is a relatively newer residential zone expanding fast with new villas and modern infrastructure.
We draw a complete drainage map before pouring and record the depth of each trap and position of every cleanout box for the house file.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It is best outside on the rear wall or side garden to avoid odours indoors. It must rise at least one metre above any window to disperse air away from living areas.
Typically three or four: one under each main or extra bathroom and one where garden and courtyard drainage joins the main line. Adding one box at the far corner of the foundation eases access to any blockage.
