Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Farwaniya
Kitchen first-fix in Abraq Khitan means laying pipes through smaller villas and medium flats. We position hot and cold supply, waste and vent before partition walls close. Every joint is pressure-tested before drywall seals the space. This stage determines later project success and avoids costly rework.
Villas and flats in Abraq Khitan sit on similarly-sized plots with standardized kitchen layouts. Most villas have their own waste stack at the rear corner or beside the toilet. We measure distance from sink to stack and calculate the required fall. If the stack is far away we use 75 mm pipe instead of 50 mm to handle higher flow volume.
Abraq Khitan in Farwaniya is a residential area of uniform villa and flat designs with consistent layouts.
We test each line with cold water then hot water separately before running both together because thermal expansion affects plastic pipe joints.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the stack is close to the kitchen we use 50 mm straight from the sink. If we combine the second bathroom waste with the kitchen we step up to 75 mm before entering the main stack. We test capacity with real simultaneous discharge from both sources.
No, this requires written permission from the neighbour and the municipality. Instead we bend the pipe within your property line and wait for a separate waste stack. It takes longer but avoids legal complications.
