Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Ahmadi
Drain line installation in Abu Halifa starts with a strict plan because the area is coastal and groundwater runs high. We run waste lines from bathrooms and kitchens on reliable falls toward traps with raised rims. We install robust vent stacks and test performance before any final backfill.
Villas and apartments in Abu Halifa stand on coastal clay-mixed soil, and groundwater can rise to near surface quickly. The traps themselves we make deep with waterproofed walls against external groundwater seepage. We surround drain lines with washed gravel and filter sand to stop clay slipping into pipes. And in plastic pipes we use larger diameters than usual for easy periodic cleaning when deposits build up from brackish water.
Abu Halifa is a coastal area in Ahmadi governorate near Abu Halifa Co-op, marked by shallow groundwater.
We measure groundwater level before digging and raise the trap at least one metre above the highest expected level.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We build trap walls from reinforced concrete at sufficient thickness and coat outer walls with waterproof membranes. We raise the trap itself above the highest forecast groundwater level based on area records.
Brackish water deposits salt on pipe walls and reduces effective diameter. We use pipe diameters ten percent larger and plan periodic cleaning every two years with high-pressure water jetting.