Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Capital
Drain foundation in Mirqab requires precise planning because old buildings stand beside new projects. We run pipes from new foundations and survey existing old lines to avoid conflicts. Every floor trap is tested before pouring and final backfill.
Old Mirqab buildings around the Central Market have shallow foundations and historic drain lines with no accurate plans. Before starting we dig test holes to map old line positions and routes. New buildings near the Grand Mosque have deep foundations where we lay waste pipes on a suspended concrete bed, protecting foundations from groundwater seepage.
Mirqab is in Kuwait City near Central Market and Grand Mosque, a mixed district of old and new building stock.
Where a new line must cross an old one, we raise the new line at least 30 centimetres to prevent interference and pressure on both.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We dig test pits at multiple points before design to find old lines and record their depths. If usable, we clean and water-test the old line and reuse it. If not, we run a new line above it, clearing it completely.
Yes, shallow foundations leave little room for pipes. We design steep, short runs with aggressive falls and use pumps if needed to ensure water drains quickly without pooling.
