Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Mirqab starts by locating the main waste stack then pulling supply lines from the building base to every fixture point. We lay all pipes before finishes and test the complete system under full pressure and flow before closing walls and ceilings.
Older Mirqab buildings near the Central Market and Grand Mosque have main waste stacks inside load-bearing walls, which limits where a new bathroom can sit. We check the original building plan or probe walls carefully to find the stack location. Supply lines we run either on exterior surfaces in visible metal pipes or inside plastic ducts depending on the finish required.
Mirqab in Kuwait governorate near the Central Market and Grand Mosque is an established district mixing older blocks with limited new construction.
Before closing walls we fill all supply lines at 8 bar for 15 minutes and inspect each joint for water vapour indicating a small leak.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Sometimes yes by reading the original plan or tracing drain pipes down from the floor below. If that fails we probe a small section of wall in a hidden spot to confirm before full planning.
Depends on the finish wanted and space available. We offer options: polished copper or metal pipes look professional, neutral plastic ducts, or full concealment within walls if possible.
