Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Farwaniya
Drain setup in Sabah Al-Nasser starts by locating the main stack near the Sixth Ring Road. We run waste lines at steady falls from every bathroom and kitchen and raise vent outlets directly above roof level. Pressure testing takes a full hour before concrete pours.
Sabah Al-Nasser houses are relatively modern near the highway, meaning deeper foundations and building work requiring high precision. We route waste lines away from fresh-water pipes and maintain safe separation between them. Floor traps are placed near property edges for easy access to the main stack if repair is needed later.
Sabah Al-Nasser lies near the Sixth Ring Road in Farwaniya governorate and is a developed residential district.
We raise the main vent stack at least one metre above roof because strong winds near the highway affect short vent pipes.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We plot all pipes on a drawing before digging and maintain at least thirty centimetres horizontal separation. If crossing is unavoidable, the waste pipe passes at least fifteen centimetres below the water line.
A trap near the boundary simplifies access to the main stack without breaking the yard if blockage occurs. Optimal spacing between interior and exterior cleanouts is thirty metres maximum.