Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Sabah Al-Nasser means running hot and cold supply and waste from the roof tank and heater to every fixture before walls and ceilings close. We map pipe routes and secure all runs against the framework. We pressure-test supply and flow-test waste before handing over the shell to the next trade.
Most Sabah Al-Nasser villas are newer builds with a main bathroom above ground level, guest bathrooms on the ground floor and sometimes a separate staff washroom. This means long supply runs from the roof tank and multiple waste outlets that each need proper fall. We run copper and plastic pipes through pre-cut openings in walls and slabs while avoiding crossovers with electrical and air conditioning runs. Every loop is tested under air pressure before builders return to fill the voids.
Sabah Al-Nasser sits in Farwaniya governorate near Sabah Al-Nasser Co-op, a modern villa district where clean rough-in must be done before structural work closes up.
We hold supply lines at steady air pressure for thirty minutes because small leaks only show under pressure before walls close.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Every supply line is tested under steady air pressure for half an hour before closure. Waste lines are run at full flow from every endpoint to check fall and smooth drainage.
No, each needs its own pipe, and copper or plastic lines are spaced apart at a safe distance. This prevents heat transfer and keeps cold water at proper temperature.
