Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Hawalli
Drainage first-fix in a Salmiya tower flat rarely stays inside that flat. Waste pipes for a moved bathroom often pass through the slab into the ceiling void of the flat below, so near Gulf Road we arrange access with the downstairs neighbour and seal every penetration against fire and noise.
Many Salmiya towers carry each flat's drains in the ceiling void of the flat beneath, so relocating a toilet upstairs means new holes cored through the slab and new pipe runs over a neighbour's living room. Before coring, the slab is scanned for reinforcement and embedded conduits. Each new pipe is wrapped with acoustic lagging where it crosses the void, and the slab penetrations are sealed with fire-rated collars. The run is water tested with the neighbour's ceiling still open, so any weeping joint is caught before it is closed.
Salmiya, along Gulf Road near Marina Mall and Sultan Centre, has apartment towers where each flat's drains run through the ceiling below.
A waste pipe crossing a neighbour's ceiling void without acoustic lagging carries flushing noise into their room.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In most towers, yes, because the new pipes pass through their ceiling. We plan the work with them and building management before coring.
Much less if the pipe is lagged where it crosses their void. We wrap every new run there before the ceiling is closed.