Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Ahmadi
Drain-line foundation in Zour industrial zone blends cooling water and sanitary discharge into one calculated system. We lay waste runs from cooling towers, boilers and labs at steady fall. Each branch is separated from the next by a numbered inspection chamber. We hydro-test every section for thirty minutes under pressure before burial.
At Zour power stations, cooling towers discharge large volumes of cold water, but this never mixes with sanitary waste. We run a separate cooling-water line that empties into a large sump instead of the main station. Sanitary discharge from buildings travels in its own line at clear fall. Inspection chambers are built large to handle high flow and fitted with heavy steel covers that bear the weight of heavy plant.
Zour lies in Ahmadi governorate, a power-generation zone where handling massive water flows is mandatory.
Discharge quality from each building is screened through a test filter before entering the main line, because equipment failure can release oil or grease.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We draw two separate networks from the start, each with different colours on the plans. The cooling line ends in a holding sump, and sanitary waste ends at the main treatment plant.
No, we use chambers one and a half metres across to slow velocity and let heavier matter settle. Covers are heavy steel to withstand loading and vibration from plant overhead.