Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
First-fix plumbing and electrical in Daiya starts with reading the architect's plan and coordinating with the builder on timing before concrete pours. We lay pipe routes in floors and walls, run power cables from the distribution board, then pressure-test and circuit-check before walls and ceilings close.
New Daiya villas are often large multi-storey houses with several bathrooms on each floor, meaning a complex waste network that needs steady fall from each bathroom to the main stack. We plan waste routes horizontally in floors to avoid load-bearing columns and beams, then clip every pipe before concrete pours. Electrical wires run through metal or plastic conduits with enough spare to pull new cables later.
Daiya is an upscale residential area in Kuwait governorate near British School, where modern villas demand complex mechanical systems.
Every pipe route is air-pressure tested before walls close to confirm there are no leaks at any joint.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We run branch pipes from each bathroom towards the villa's central axis where the main stack sits, maintaining at least one-in-a-hundred fall for stable flow. On upper floors we may use smaller-diameter pipes because the load is lighter than on the ground floor.
We plan their positions at permitted intervals before pouring, usually where pipes change direction or before entering the main stack. These chambers stay in the final floor above the tiles with easy-open covers for cleaning and inspection.