Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Ahmadi
First-fix plumbing and electrics in Julaiaa starts with a soil survey and mapping natural ground fall toward drainage lines. We focus on laying waste runs at steady falls no less than half a per cent toward sumps. Pipe and conduit are divided into separate groups, secured and tested before concrete is poured.
Small residential and commercial buildings in Julaiaa are built on relatively low ground with shallow soil traps, which eases connection but demands tight spacing. We run cold supply in an upper trench away from direct contact with waste. We map every pipe and cable precisely before concrete and leave clear surface markers.
Julaiaa is in southern Ahmadi governorate, a desert zone with mixed soil where new residential projects are spreading.
All trenches are backfilled with a ten-centimetre sand layer under pipe to reduce slab vibration when water flows.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We apply a fall of at least 0.5 per cent, or five millimetres per metre of length. We survey the natural ground first and choose a waste route that keeps this fall from building to sump without deep digging.
Yes, we separate them horizontally by at least ten centimetres and wrap hot pipe in foam insulation. This keeps temperatures steady and reduces heat loss under the slab.