Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in in Julaiaa starts by assessing water and waste lines for houses on scattered, spacious land. We run supply and waste pipes before walls rise, testing every joint at high pressure. Steady waste fall is critical in this desert zone where soil varies. We study drainage options and best pipe routes before starting work.
Houses in Julaiaa scatter across large plots where bathrooms sit far from the main waste point. We choose a pipe route avoiding deep excavations and obstacles, and use larger pipe sizes over long runs. Sandy and gravelly soil eases digging but needs extra support under raised pipe sections. A deep floor trap or well-designed soakaway pit prevents flooding and odours in hot summer months.
Julaiaa in Ahmadi governorate is a southern desert zone where residential buildings stand far apart on expansive land.
Every waste pipe is tested at a minimum fall of 2cm per metre; any less may cause silt accumulation.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Sandy soil may collapse around the pipe over time, especially in rare rains. We bed the pipe on a gravel layer and cover it with compacted sand to prevent settling and cracking.
We dig to around 2 to 3 metres depth where soil is more stable and absorbent. We fill the pit with layered sand and gravel to improve drainage and fast absorption.