Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Ahmadi
First-fix plumbing and electrical installation at Khiran seaside chalets requires protection from salt spray and seasonal humidity. We select moisture-resistant cable, galvanized pipe and approved marine-grade insulation before wall closure. Each route is tested for high electrical insulation and water pressure.
Khiran chalets are lightweight structures on shallow foundations near sea level, and salty humid air penetrates fine cracks quickly. We lay only copper and galvanized pipe, cable with double jackets, every conduit sealed with marine-grade sealant. Exterior ceilings and walls need continuous ventilation to prevent moisture accumulation around pipes.
Khiran sits in Ahmadi governorate on the Gulf coast and is known for short-term resort rentals and seaside tourist cabins.
Every electrical cable is checked for insulation resistance with a megohm meter before handover because salty humidity reduces resistance quickly.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, iron rusts quickly in salt air even with paint coating. We use heavy copper or galvanized pipes with isolated brackets that prevent moisture absorption from concrete.
We seal every penetration with approved marine sealant and fit gland seals around pipes. Exterior wall openings are raised above seasonal rain splash level.
