Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in at Khiran focuses on seaside villas and wooden resort chalets with large grounds and shifting sandy floors. We run salt-resistant supply and waste and test fall on unstable ground before construction closes around the lines.
Khiran villas and Khiran Pearl resort chalets sit on sandy soil that shifts with wind and seasonal floods, and floors often rest on short timber foundations. Waste pipes need strong brackets and close-spaced inspection points because sand buries lines and causes fall collapse. Near the main Khiran shoreline salt air and brackish groundwater intensify, so we choose copper or marine plastic and bury waste deep enough to resist tampering and erosion.
Khiran sits in Ahmadi governorate on Kuwait's southern coast, where seaside resorts and villas rest on unstable sandy ground.
We bury waste lines at least 80 cm deep to protect them from seasonal sand scour and disturbance.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Very much, sand collapses and changes fall over time. We test fall before handover and secure pipes on isolated supports clear of soil.
Because sand migrates and buries lines, so we need quick access to clean and check. Spacing averages 20 metres instead of 40 in stable areas.
