Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Hawalli
In Mubarak Al-Abdullah, first-fix plumbing and electrics has to reach the roof as well as the rooms. The storage tank, transfer pump and water heater positions are fixed early so their feed pipes, pump cable and control wiring rise through the building in planned routes.
Many homes in this Hawalli suburb draw from a ground tank and lift water to a roof tank, so a pump circuit, a float switch cable and a rising main have to climb from ground level to the roof. When these are decided late they end up clipped to the outside wall, exposed to sun and damage. At first-fix a dedicated vertical duct carries the rising main and a separate conduit carries the pump and float wiring, with roof penetrations sleeved and sealed before the waterproofing goes down.
Mubarak Al-Abdullah is a Hawalli governorate suburb of family homes, many drawing from a ground tank lifted to a roof tank.
Pump and float cables clipped to an outside wall are exposed to direct sun that hardens insulation over time.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before first-fix starts. The tank position sets the rising main route, the pump cable run and where the roof slab needs sleeves, all of which are hard to add after waterproofing.
Yes. A float switch in the roof tank signals the pump at ground level, so a control cable runs in its own conduit alongside the pump supply.