Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
Before walls close on new Nahda projects we lay water, waste and electrical routes per approved architectural plans. We map entry points from the main meter and set horizontal and vertical distribution paths. Each system is pressure-tested before walls seal.
Nahda overlooks the Fourth Ring Road junction with multi-storey apartment blocks on a standard repeated layout where bathrooms and kitchens usually match floor to floor. This lets us run uniform piping more simply than freehold projects. We focus on precise falls from each bathroom and kitchen to the main collection point in the basement. Most pipes run under-floor or inside bathroom walls to stay hidden from living areas.
Nahda is in the Capital near the Fourth Ring Road junction, an area of new standardised apartment blocks with repeated floor plans.
Because of standardised design we can test the first sample floor under pressure and leaks, then apply the same standards to other floors with confidence.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, mostly they match because the plan is uniform. But we check each unit because some have a servant's room or extra bathroom needing a separate waste route.
We test floor by floor from bottom up, every two floors together at 10 bar for one hour. Starting ground and first, then moving the pump to second and third floors, and so on.