Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
In Jaber Al-Ahmad City, pipe and electrical paths are marked on every floor before wall finishes go on. We start by installing main water and waste stacks along the building length. Branch pipes leave the stacks at sizes matched to meters and bathroom count. Pressure and water tests come before any new covering.
New residential blocks in Jaber Al-Ahmad are built on open-plan layouts with multiple rooms, needing long pipe runs from central stacks to far corners. We calculate each branch length and diameter based on expected flow and distance. Waste pipes need steady falls across thick concrete floors, so we use a laser level to verify every slope. Penetrations are drilled in marked spots before concrete sets. Digital photos of each route help finishing teams later to avoid pipes.
Jaber Al-Ahmad City in Kuwait governorate holds hundreds of new villas and apartments where main water pipes branch from the central distribution point.
Every water stack is held at steady pressure for two hours before handover because high pressure reveals small solder joint leaks.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Very hard, because cutting and rerouting weakens the slab and delays the schedule. We confirm every waste pipe position with the contractor two days before pour. Post-pour changes need written approval from both the engineer and client.
After all pipes and fittings are installed but before any concrete pour. We seal all open ends and raise pressure gradually to seven bar, watching the gauge for ten minutes. Any drop means a leak that must be fixed immediately.
