Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Mubarak Al-Kabeer
In Qosor, routing pipes and wires in new builds requires understanding sandy soil and slopes, which may need extra supports for waste lines. We lay pipes and cables before construction and test each section before sand fill and structural elements are placed.
Houses in southern Qosor are usually single villas on large plots, meaning long distances from the building to the main sewer line. We run pipes underground with steady fall towards the street or island. Sandy soil shifts after rain so we use reinforced pipes at larger diameter and support them with concrete at critical points. Electrical runs keep clear of waste lines.
Qosor lies in southern Mubarak Al-Kabeer, a district of single villas and large open plots.
Waste pipes in Qosor are flushed for thirty minutes under running water because sandy soil demands longer testing.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we check the fall every three metres and use larger-diameter pipes than standard. Sandy soil may settle after filling and watering, so we place concrete supports under main lines.
Waste pipes must be at least half a metre from foundations and supports. Electrical wires stay one metre or more from waste lines. Every route is marked on the final plan.
